Our Flagship Projects

A320 Program – Airbus Atlantic
Strategic Technical Reinforcement
The Context
At an A320 assembly site, a tier 1 client was facing a critical delay on the lower and upper wing panels, impacting the entire production chain.
The AMG Solution
- Deployment of 8 qualified fitter-assemblers in less than 10 days
- Integration in shifts (2×8) with dedicated AMG supervision
- Direct coordination with the client’s methods teams to ensure a smooth production ramp-up
The Result for Our Client
A return to a controlled production rate and the securing of on-time deliveries.